
Alfen
Off-grid energy storage system for Ibogem in Belgium
De Alfen
Date de publication: 24 septembre 2018
Temps de lecture: 1 minute
Alfen supplied an energy storage system in Beveren, at a site of Ibogem, a Belgian inter-municipal cooperation partnership.
The storage system allows Ibogem to charge their forklifts with solar-powered energy, generated during the day by solar panels on the roof.
The project was completed in the final quarter of 2018.
TheBattery Elements
TheBattery Mobile X
TheBattery Elements 2.0